Thursday, 28 February 2013
Bullion Carriers: Body and Underframe Complete
The major push this week has seen the last of the rebuilding of elements and adding of detail to both the underframe area and body of the bullion van for Train Simulator 2013.
All that's left now is to construct the friction damped B5 bogies that will go under these vehicles. The bogies have been mocked up and the frames are in the process of being fabricated.
Labels:
add-on,
addon,
bullion van,
Carriage,
expansion,
mark 1,
NXV,
Project East Coast,
RailWorks 3,
stock pack,
Train Simulator 2013
Monday, 25 February 2013
Bullion Carriers: Underfloor bits and pieces
Much of the effort in the past week has been in completing and upgrading where required the under frame equipment on the Bullion Van for use in this project and others. The under frame is now dual braked as accurately as is practical from our reference photographs and has had the brake rigging modified for use with the B5 bogies that will be fitted.
The air cylinder, distributor and air cylinders have been extensively reworked as has the vacuum cylinder. A new dynamo has been built for good measure.
Next up is a fair bit of fine detailing on the coach body and adding the interior along with making those B5 bogies!
Labels:
add-on,
addon,
bullion van,
Carriage,
Coach,
download,
expansion,
mark 1,
NWX,
Project East Coast,
Railworks,
Stock Packs,
Train Simulator 2013
Saturday, 16 February 2013
The Devil is in the Detail
The last modelling session was one of those strange ones where there seemed a lot of effort and no major impact.
It was detail time with the vents and periscopes going on the roof. The underframe has gained most of the required equipment and the ends have have had their last bits added.
The interior is still a quandary at the moment with most reports mentioning bullet proof double glazing, heavy tint and even mirror effect glass. Photographs do support this so it may be a case of making the vestibule visible and something creative with the the saloon windows.
Tuesday, 12 February 2013
Feeling Secure?
An in development render of the NWX Security Bullion Vehicle with bodyside windows cut and the majority of end detail complete.
The roof still requires ventilators and periscopes, the windows need to be glazed and then there's just the small things like underframe details and a pair of B5 bogies!
Labels:
add-on,
addon,
expansion,
mark 1,
NWV,
Project East Coast,
Railworks,
Render,
Security Bullion Vehicle,
Stock Packs
Friday, 14 December 2012
Brake Van Variety
Been hanging on to this little shot of the completed brake van shapes for a bit and didn't get round to posting them!
These are both from lot 3129 and built to dia 1/506 with the right hand one being as constructed with a through vacuum pipe. The van on the left has had it's vacuum pipe removed as gained (like some other vans but by no means all) a grey end when this happened to signify that it is now effectively unfitted.
Once the HBA and HEA hoppers have finished being kicked around to make them look dirty and used it will be the turn of the brake vans which are looking way too clean!
Labels:
add-on,
addon,
brake van,
CAO,
CAP,
Project East Coast,
Railworks,
Train Simulator 2013,
Wagon
Subscribe to:
Posts (Atom)








