Saturday 23 April 2011

Easter Brake

Fastline Simulation: dia 1/507 CAR brake van for Railworks.
With the high poly version of the dia 1/507 brake van for RailWorks complete and ready to join the unwrapping and baking line it's time to take a couple of days off for Easter.

Friday 15 April 2011

Getting Warmer

Fastline Simualtion: CAR Brave Van.
Looks like the guard has got the stove lit to keep the chills at bay.

Monday 11 April 2011

Breaking the game?

Fastline Simulation: dia 1/507 brake van that will be included in the VDA stock pack for RailWorks under test.
It's always satisfying to see the completed shape in game, even if this one has been in and out a few times with holes that needed plugging. It's strange how a shape that appears simple suddenly throws some deceptive problems.

With the basic shape complete it will be off to the testers for a bit of a critique while the interior is created and hopefully a bit more of the VDA unwrapping can take place.

Monday 4 April 2011

Getting a hand hold

Fastline Simulation: dia 1/507 20T brake van.
After a week where other matters have had to take priority over the modelling I've found some time to add some more of the detail to the dia 1/507 brake van that will be included in our VDA stock pack for RailWorks.

All that remains now are a few brackets and angle pieces and the myriad of bolt heads and rivets to bake onto the final texture.